Online Contractor Induction www.colesgroup.com.au
  Contractor Safety Home   |   Contact Us   |     Online Contractor Induction     
Add to Favourites  
  
Online Contractor Induction

   FAQ Induction
   Safety Policy
   Coles Group Inductions
   Signing in on arrival at Store/Site
   Safe Work Method Statement (SWMS)
   Health and Safety Management Plans
   Work permits
   Contractor spotchecks
   Chemicals and MSDSs
   Plant and Equipment
   Asbestos Register
   Incident management
   WHS Schedule
   Prequalification process
   Working from Heights
   Electrical Safety
   Ceiling Space Access
   Traffic Management and Mobile Phones
   Transport and Delivery Drivers
  

Electrical Safety

  • All power leads, portable electrical tools and RCDs used on sites must be tested and tagged in accordance with AS 3760 and legislative requirements
  • Only qualified and licensed persons are to conduct electrical work (Those with restricted electrical licences may complete work in line with the restrictions of the licence)
  • Electrical leads to be positioned to ensure they will not be damaged or exposed to wet areas
  • Electrical leads must not cross the store aisle ways and must be concealed to avoid trip hazards
  • Double adaptors are not to be used on stores/sites
  • All areas for electrical works are to be isolated at the switchboard and tagged prior to proceeding with any works
  • Coles Group Electrical Lock Out Tag Out (LOTO) and Restoration of Power Guideline must be followed, a copy can be obtained here